McHenry Solar Farm 25MW

Location: Modesto, California
Client: Solar Star VIII, LLC (SunPower)

View this project at moss-solar.com.

Moss has completed the construction phase of this 25 MW project in Modesto, California. The scope of work included turn-key installation of the solar field, an on-site substation, an operation and maintenance building, and on-site improvements including access roads, site utilities and hydroseeding.

13 MW Metal Erection  |  28,000+ PV Modules (10 MW)  |  28 Days!

Optimized production = 1 to 1.5 MW of metal erection and PV per day