AZ 2

Arizona II, 62.64 MW DC

As the general contractor, Moss’ scope of work includes earthwork and civil operations, pile installation and the erection of a single axis photo-voltaic (PV) tracker system.

Project Features

  • 50 MW AC, 62.64 MW DC, PV
  • Single-axis tracker