Boulder 1, 124 MW DC
As EPC, Moss’ scope of work included the installation of the foundation piles, the erection of Oasis single-axis tracking systems, and the installation of SunPower PV modules.
Project Features
- 100 MW AC, 124.85 MW DC
- Oasis mount single-axis tracker system