• HI 2
  • HI 2
  • HI 2

HI-2, 60 MW DC

As the EPC, Moss’ scope of work includes full engineering and construction of both the 60 MW DC PV Plant and 34.5/138kV substation, as well as all sitework, electrical installation, foundation installation, and the installation of SunPower’s Oasis 3 single axis tracker system with SunPower P-Series and E-Series modules.

  • 15.90 MW AC, 60 MW DC
  • Power Electronics Inverters
  • SunPower P-Series & E-Series Modules
  • SunPower Oasis 3 single-axis tracker system
  • Over 160,000 solar panels
  • Sheep grazing will help manage vegetation while supporting local agriculture