• Kawailoa Solar
  • Kawailoa Solar
  • Kawailoa Solar
  • Kawailoa Solar

HI-4, 63 MW DC

As the EPC, Moss’ scope of work includes full engineering and construction of both the PV plant and (2) 34.5/46kV substations in coordination with the existing wind farm. Moss’ scope also includes all sitework, electrical installation, foundation installation, and the installation of SunPower’s Oasis 3 single axis tracker system with First Solar Series 4 Modules.

  • 49 MW AC, 62.66 MW DC
  • Power Electronics Inverters
  • First Solar Series 4 Modules
  • SunPower Oasis 3 single-axis tracker system
  • Over a half-million solar panels
  • Largest solar project in the state