Oregon, 69.5 MW DC

The 69.49 MW DC Solar project completed construction September 2017. As General Contractor, Moss scope of work included sitework, electrical installation, installation of the single axis tracker foundations, and installation of SunPower’s new Oasis 3 single axis tracker. Moss is the first contractor to be entrusted by the manufacturer to install their latest generation of the Oasis power plant.

  • 56.25 MW AC, 69.49 MW DC
  • Power Electronic inverters
  • 435-watt modules
  • 323 acres
  • Oasis 3 ground mounted single-axis tracker system